Maschinenring

Seekirchen am Wallersee, 2023

Total usable area: approx. 1,618m² Planning start: June 2021 Completion: January 2023 Construction time: 11 months An ensemble cons...

House of elementary education

Flachau-Reitdorf, 2022

Total usable area: 2,117m² (existing 1,180m², new building 937m²) Planning start: June 2021 Completion: September 2022 Construction ti...

District Chamer of Farmers

Hallein, 2022

Usable area: approx. 1,610m² Start of planning: February 2020 Completion: Nov 2022 Construction time: 14 months The new Chamber of ...

Children's Education Institute

Hallwang, 2022

The guiding idea of ​​the design is the formulation of a common green center for the kindergarten, the extended age groups, the toddler g...

Residental Home Wiesenweg

Altenmarkt im Pongau, 2022

The ensemble, consisting of 4 buildings, houses 39 residential units that can be owned, leased or rented. The typology of the residential...

Ronald McDonald Children´s House

Salzburg, 2021

Award, Salzburg Timber Construction Prize 2023 Total usable area: approx. 1,690m² Start of planning: October 2018 Completion: Decemb...

House of the Generations in Rauris

Rauris, 2021

After winning, Europe-wide 2-stage competition, the senior citizens’ home with 36 residential units was completed in the first constructi...

Primary School in Nusdorf

Nussdorf , 2021

By means of internal restructuring and upgrading of the existing structure by adding a wooden structure, the school building meets the re...

Resurrection Chapel

Straß im Attergau, 2020

Total usable area: approx. 50m² Start of planning: 2017 Completion: August 2020 Construction time: 24 months Recognition of public ...

Riding arena

Großarl, 2020

Usable area: approx. 900m² Start of planning: March 2019 Completion: May 2020 Construction time: 7 months The new riding arena form...

Time. Place. Weng

Goldegg-Weng, 2019

In harmony with nature, the three-storey building fits in sensitively with the existing topography and the existing ensemble. The concept...

Vivid Planet

Henndorf am Wallersee, 2019

To develop no classic office building, but to create a special working environment were the requirements of the 2017 competition by the s...

Hotel Tauernhof Pools

Flachau, 2018

The existing premises of the leisure facility of the Tauernhof from the 90s required a new structuring and modernization. New planned and...

Residential Park Haid

Wagrain, 2018

The compactly organized structure with central development responds by different cuts in the volume to the heterogeneous environment. Thr...

SFH D.

Lengau, 2013

The design aims to thematically and structurally execute the building project and implementation of the required space layout. A main res...

Gusswerk Extension

Salzburg, 2012

In a moderated procedure with the client, city planning officials, and the Salzburg Advisory Committee for Architecture, the four Salzbur...

Maschinenring Office Building

St. Johann/Pongau, 2012

The new building in St. Johann im Pongau houses the provincial office of Maschinenring Salzburg. Managing director Rudolf Huber asked for...

Road Maintenance Depot Flachgau

Seekirchen am Wallersee, 2012

The new centre of the road maintenance depots of the State of Salzburg will be constructed in Seekirchen/Flachgau. The current small loca...

Peneder Basis Office Building

Atzbach, 2010

In this spacious new building in the small community of Atzbach the successful Upper Austrian family business could integrate their satel...