The dynamics and future urban density of the district, as well as the orientation of the site, the vastness of the sky and the proximity to the water are the prerequisites for the implementation of the project. The aim is to create a modern working environment that gives this special place a strong identity, in particular by linking architecture and landscape. The project participates in the development of this new district and dialogues with the important surrounding buildings, the shopping center and the Heaquarter of Icade which are also structured around the channel Darse.

With eight levels of superstructure and three of infrastructure, the project does not exceed the limits of the plot. Towards Avenue Victor Hugo, the project presents a strong urban façade which participates actively in the urban development and serves at the same time as an acoustic barrier. In the East, the volume opens towards the water, revealing its interior spaces. The withdrawals in the higher levels correspond on the one hand to urban regulation, but also to the desire of bringing more sun and natural light into the building.

The project is based on a strong relationship between building and garden. The garden develops on three levels and offers different atmospheres. The three outdoor areas are inspired by natural environment, yet they are part of a precious landscaping design concept that offers refreshing green islands. The garden in the courtyard serves as a background for the visual continuity with the channel and guarantees a visual depth. The building is accessible through three halls. The forecourts of these halls are the only withdrawal of the project in terms of orientation; they are surrounded by a fence and closed outside office hours.

Legible materiality. The construction remains uncovered as it is “what makes the architecture”. This means that the columns are registered as structural elements without any major technical tricks. The materials - natural wood, exposed concrete, anodized aluminium - are emploid in exactly the same way; they are immediately “legible” and convey a certain relaxed quality.
The offices have roomhigh glazing, great view and ventilation sash. The details - flush junctions, integrated skirting boards, and shadow joints - ensure durable elegance.

With eight levels of superstructure and three of infrastructure, the project does not exceed the limits of the plot. Towards Avenue Victor Hugo, the project presents a strong urban façade which participates actively in the urban development and serves at the same time as an acoustic barrier. In the East, the volume opens towards the water, revealing its interior spaces. The withdrawals in the higher levels correspond on the one hand to urban regulation, but also to the desire of bringing more sun and natural light into the building.

Competition 01 | 2012
Start of planning 11 | 2012
Start of construction 03 | 2014

Surface 48 300 m

Andere projecten van Dietmar Feichtinger Architectes

Footbridges over the Seine River
Paris, Frankrijk
Passerelle de Franchissement du Bassin de Commerce
Cherbourg, Frankrijk
Sécurisation des abords de la tour Eiffel
Paris, Frankrijk
Centre sportif Hector Berlioz
Vincennes, Frankrijk
Centre hospitalier 'Klinikum am Wörthersee'
Klagenfurt